News & Views, Volume 48 | Strategic Evaluation of MAOP – Reconfirmation Plans and Options
By: Scott Riccardella and Bruce Paskett
On October 1, 2019, the Pipeline and Hazardous Materials Safety Administration (PHMSA) published amendments to 49 CFR Parts 191 and 192 in the Federal Register issuing the Pipeline Safety: Safety of Gas Transmission Pipelines: MAOP Reconfirmation, Expansion of Assessment Requirements, and Other Related Amendments Final Rule (Final Rule).
The Final Rule requires that for on-shore steel transmission pipelines in an High Consequence Area (HCA), Class 3 or 4 location without Traceable, Verifiable and Complete (TV&C) records for §192.619(a)(2) (pressure testing, including records required by §192.517(a)) ; or where the Maximum Allowable Operating Pressure (MAOP) was established based on the Grandfather Clause and the MAOP creates a stress ≥ 30% of the Specified Minimum Yield Strength (SMYS), an operator will need to reconfirm the MAOP in accordance with the provisions of §192.624.